Tarificación 3.0TD de la Red E icon

Tarificación 3.0TD de la Red E

MiereSoft
$1.00
1+ downloads

About Tarificación 3.0TD de la Red E

Application intended for industrial consumers and SMEs in Spain, with a contracted electrical power greater than 15kW.

The app shows the active tariff period at the current time.

The new 3.0TD charging periods prepared by the CNMC will replace the 3.0A access tolls with a contracted power greater than 15kW.

The new 3.0TD toll consists of:
5 Geographical locations: Peninsula, Balearic Islands, Canary Islands, Ceuta and Melilla.
4 seasons a year: A- (high), B- (medium-high), B1- (medium), C- (low).
6 periods to be distributed during the day: P1, P2, P3, P4, P5, P6 (from the most expensive to the cheapest).

Tarificación 3.0TD de la Red E Screenshots