The program is designed for drilling engineers to feed the tool at very low ROP. It is necessary to enter the initial data into the program: 1) the initial bottomhole in meters 2) the required mechanical speed of drilling (drilling in time) in m / h 3) the tool feed interval in cm. The program calculates how long it takes to feed a given number of centimeters in order to as a result, they had a given mechanical speed. Also, the feed interval will be added to the initial depth, so if there is a driller monitor or a mud log monitor, then you can compare the real depth with the planned one at a given time interval.
Show More