Profile Widget
Gonzalo Rodríguez Píriz
4.1 ★
380 ratings
1,000+
downloads
$0.99
In this profile management app, you can create and activate custom profiles for your phone to control settings like volume, Wi-Fi, and brightness. Includes widget customization options and integration with Tasker and Locale.
AppRecs review analysis
AppRecs rating 4.1. Trustworthiness 0 out of 100. Review manipulation risk 0 out of 100. Based on a review sample analyzed.
★★★★☆
4.1
AppRecs Rating
Ratings breakdown
5 star
55%
4 star
25%
3 star
11%
2 star
0%
1 star
8%
What to know
✓
High user satisfaction
80% of sampled ratings are 4+ stars (4.1★ average)
✓
Authentic reviews
Natural distribution, no red flags
About Profile Widget
Profile Widget is an app that helps you manage profiles for your phone.
These profiles can handle:
* Volume (ring, notification, alarm, system and multimedia) .
* Vibration.
* Default phone ringtone.
* Default notification ringtone.
* Wi-Fi status.
* Mobile data status (Android 2.x, 3.x, 4.x).
* Bluetooth status.
* Screen timeout.
* Screen brightness.
* Automatic data sync.
* Airplane Mode (Android 2.x, 3.x, 4.0.x).
The profiles can be activated both from the app itself and from the home screen widget provided. To add the widget, you just have to long press on an empty space on the desired home screen and select Widgets -> Profile Widget.
The home screen widget can be customized for each profile with 25 colors (6 in Lite version) and 49 icons (5 in Lite version).
Also, if you don't want to use the widget, there's the option to add shortcuts to activate the profiles to the homescreen.
From version 4.0 on, Profile Widget integrates with Tasker and Locale.
With this app you can easily switch your phone from, say, a vibration+no sound mode to a full volume mode to a completely silent mode with just a single click!.
About the permissions: the app now asks permission to read the phone state, just in order to change the volume of the calls when the phone is ringing (the only way of separating notification and ringer volume in Android 4.0+). It cannot do anything else with this information, since it does NOT have Internet access, call or SMS permissions.
These profiles can handle:
* Volume (ring, notification, alarm, system and multimedia) .
* Vibration.
* Default phone ringtone.
* Default notification ringtone.
* Wi-Fi status.
* Mobile data status (Android 2.x, 3.x, 4.x).
* Bluetooth status.
* Screen timeout.
* Screen brightness.
* Automatic data sync.
* Airplane Mode (Android 2.x, 3.x, 4.0.x).
The profiles can be activated both from the app itself and from the home screen widget provided. To add the widget, you just have to long press on an empty space on the desired home screen and select Widgets -> Profile Widget.
The home screen widget can be customized for each profile with 25 colors (6 in Lite version) and 49 icons (5 in Lite version).
Also, if you don't want to use the widget, there's the option to add shortcuts to activate the profiles to the homescreen.
From version 4.0 on, Profile Widget integrates with Tasker and Locale.
With this app you can easily switch your phone from, say, a vibration+no sound mode to a full volume mode to a completely silent mode with just a single click!.
About the permissions: the app now asks permission to read the phone state, just in order to change the volume of the calls when the phone is ringing (the only way of separating notification and ringer volume in Android 4.0+). It cannot do anything else with this information, since it does NOT have Internet access, call or SMS permissions.