Atomizer do Brasil icon

Atomizer do Brasil

Farmgo
Free
500+ downloads

About Atomizer do Brasil

The Atomizer do Brasil application allows you, the owner of Incorporate equipment, to have in your hands everything you need to know when incorporating chemical, biological and nutritional products directly into the soil, at the time of planting, in order to control pests, diseases and make nutrients available for your plantation. Wireless communication with the machines is done via Bluetooth connection.

Machines: List of all machines that have been added with summary data for each one. At the end of the list, it is possible to add a machine.

Panel: Monitor all equipment operating data and control the main functions.

Log: Generate data records of everything that happens with your machine. You can copy and send logs to Atomizer if you need any support.

Jobs: After reading the log, job reports are generated each time the machine is turned on. They are organized by date and you can define a different name for each job.

Settings: Configure the operating parameters in an easy and practical way.

Contact Atomizer to receive a username and password to use the application. This application does not replace the original machine control, which still needs to be connected for the program to function properly.

Access the website www.atomizer.com.br and get to know our equipment and products.

Atomizer do Brasil Screenshots