Daewoo-TPL Joint Venture have developed a digital system to implement Reduction Of Risk principle during execution at the Mumbai Trans Harbour Link project.
Features:
Request, Issue and Review ROR with safety control measures
Time based algorithm to track, calculate and report total risk at the project
Photo / video evidence against each safety check
Reports and dashboards showing risk status of the project
Features:
Request, Issue and Review ROR with safety control measures
Time based algorithm to track, calculate and report total risk at the project
Photo / video evidence against each safety check
Reports and dashboards showing risk status of the project
Show More