Facade precast item tracking app.
Monitoring with precast facade defect control within 6 stages:
1. Concreting
2. Factory QC
3. Ship out from the factory
4. Delivery to HK
5. Site acceptance QC
6. Facade installation
Monitoring with precast facade defect control within 6 stages:
1. Concreting
2. Factory QC
3. Ship out from the factory
4. Delivery to HK
5. Site acceptance QC
6. Facade installation