Just Entering the Location Data (Through G. Maps), Installed power (or to be installed), Occupied Ha., Inclination, Type of structure, etc... It is not necessary to enter solar data since the application obtains them directly from the Bases data from PVGIS*.
The following results are obtained:
-Annual production
-Mensual production
-HSP (Peak Solar Hours)
-Necessary Panels
-Estimated Annual Income
-Cost and estimated expenses
-Performance and losses of the system.
-Estimated results of the installation.
-Etc…
*Only in locations where PVGIS is registered.
The following results are obtained:
-Annual production
-Mensual production
-HSP (Peak Solar Hours)
-Necessary Panels
-Estimated Annual Income
-Cost and estimated expenses
-Performance and losses of the system.
-Estimated results of the installation.
-Etc…
*Only in locations where PVGIS is registered.
Show More