Flight Dark Pro - Icon Pack
Nate Wren Design
4.8 ★
193 ratings
10,000+
downloads
$2.49
In this icon pack app, you can browse, customize, and apply dark black icons to your device's home screen and app drawer. Includes wallpapers, request icons feature, and support for various launchers.
AppRecs review analysis
AppRecs rating 4.5. Trustworthiness 56 out of 100. Review manipulation risk 35 out of 100. Based on a review sample analyzed.
★★★★☆
4.5
AppRecs Rating
Ratings breakdown
5 star
91%
4 star
7%
3 star
1%
2 star
0%
1 star
1%
What to know
✓
High user satisfaction
91% of sampled ratings are 5 stars
✓
Authentic reviews
No red flags detected
About Flight Dark Pro - Icon Pack
Flight Dark Pro is a simple minimalist, clean, flat & dark black icon pack with semi-transparent icons that blend in well with your backgrounds. Icons feature a clean and flat handmade design. Custom wallpapers featuring scenic skies, and clouds are included.
QUICK TIPS
You can manually edit icons in most launchers by long-pressing the icon you would like to edit.
Widgets: If your widget stops updating, please check your system or battery settings to make sure the app is exempt from battery optimization. More info at https://dontkillmyapp.com/
PRO VERSION
This is the pro version of the Flight Dark icons. Get the free version here: https://play.google.com/store/apps/details?id=com.natewren.darkflightfree
HOW-TO GUIDE
http://natewren.com/apply
FEATURES
• 5,300+ hand crafted flat, clean & simple dark black flat HD Icons
• 200+ wallpapers included. Downloadable from the cloud. Browse and save the ones you want. All wallpapers shown are included!
• XXXHDPI high definition black icons included for super large HD screens. All black icons are 192x192
• Customized cloud/sky/landscape wallpapers. Wallpapers have been edited to show off the black icons nicely
• Some parts of the flat icons are transparent letting each show the provided sky/landscape backgrounds or to your own backgrounds
• Wallpaper chooser comes installed
• Request icons via "Request" tab
• Clean, dark black icons work best with light wallpapers
• Muzei support for rotating wallpapers
• New icons added regularly
WIDGETS
System widgets as well as editable KWGT widgets are included.
• Battery widgets
• Digital clock widgets
• Analog clock widget
• Weather widgets
HOW TO APPLY ICONS VIA ICON PACK
1. Open the app after installing
2. Navigate to "Apply" tab
3. Select your Launcher
DISCLAIMER
You may need a 3rd party launcher to apply the icon pack. Please download a launcher (Nova, Total, Microsoft, etc.) before installing.
Nova is recommended for the best experience and supports icon name search when manually applying icons. For more info on searching while manually applying icons please visit https://natewren.com/manually-edit-icons/.
HOW TO APPLY ICONS VIA LAUNCHER
1. Open Launcher settings by tapping + holding on an empty area of home screen
2. Select personalization options
3. Select icon pack
FOLLOW ME
Twitter: https://twitter.com/natewren
QUESTIONS/COMMENTS
natewren@gmail.com
http://www.natewren.com
QUICK TIPS
You can manually edit icons in most launchers by long-pressing the icon you would like to edit.
Widgets: If your widget stops updating, please check your system or battery settings to make sure the app is exempt from battery optimization. More info at https://dontkillmyapp.com/
PRO VERSION
This is the pro version of the Flight Dark icons. Get the free version here: https://play.google.com/store/apps/details?id=com.natewren.darkflightfree
HOW-TO GUIDE
http://natewren.com/apply
FEATURES
• 5,300+ hand crafted flat, clean & simple dark black flat HD Icons
• 200+ wallpapers included. Downloadable from the cloud. Browse and save the ones you want. All wallpapers shown are included!
• XXXHDPI high definition black icons included for super large HD screens. All black icons are 192x192
• Customized cloud/sky/landscape wallpapers. Wallpapers have been edited to show off the black icons nicely
• Some parts of the flat icons are transparent letting each show the provided sky/landscape backgrounds or to your own backgrounds
• Wallpaper chooser comes installed
• Request icons via "Request" tab
• Clean, dark black icons work best with light wallpapers
• Muzei support for rotating wallpapers
• New icons added regularly
WIDGETS
System widgets as well as editable KWGT widgets are included.
• Battery widgets
• Digital clock widgets
• Analog clock widget
• Weather widgets
HOW TO APPLY ICONS VIA ICON PACK
1. Open the app after installing
2. Navigate to "Apply" tab
3. Select your Launcher
DISCLAIMER
You may need a 3rd party launcher to apply the icon pack. Please download a launcher (Nova, Total, Microsoft, etc.) before installing.
Nova is recommended for the best experience and supports icon name search when manually applying icons. For more info on searching while manually applying icons please visit https://natewren.com/manually-edit-icons/.
HOW TO APPLY ICONS VIA LAUNCHER
1. Open Launcher settings by tapping + holding on an empty area of home screen
2. Select personalization options
3. Select icon pack
FOLLOW ME
Twitter: https://twitter.com/natewren
QUESTIONS/COMMENTS
natewren@gmail.com
http://www.natewren.com
Flight Dark Pro - Icon Pack Screenshots
Tap to Rate:
Reviews for Flight Dark Pro - Icon Pack
Adrian Dluhosh
7/22/2025
We really need an icon for Qobuz! It's one of the largest music streaming platforms.
Petar Belacevic
1/11/2024
Exeptional design!