The Cat Escape icon

The Cat Escape

Next Dreams Project

3.7

store rating

5,000+

downloads

Free

AppRecs review analysis

AppRecs rating 3.7. Trustworthiness 0 out of 100. Review manipulation risk 0 out of 100. Based on a review sample analyzed.

★★★☆☆

3.7

AppRecs Rating

Ratings breakdown

5 star

58%

4 star

0%

3 star

14%

2 star

14%

1 star

14%

What to know

Authentic reviews

Natural distribution, no red flags

About The Cat Escape

This is puzzle game,help the Orange save and escape his friends.
-easy to play
-move the box or dodge the obstacle to find your way.
-alwasy update level
so install and play with the cute cat
The Cat Escape Screenshots
Screenshot 1Screenshot 2Screenshot 3Screenshot 4
Similar to The Cat Escape

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact