Get energy consumption data from the utility meter and cross them with solar photovoltaic production. Use this information to gauge your facility and maximize the exploitation of resources (generation production v).
According to the Spanish regulation RD 1110/2007 of 24 August mandatory for accountants Type I and II, with more than 75kW contracted power. and all counters from 15kW with contracted 3.0 or 3.1 or higher rates.
Unlimited access closures and load curve provided it is stored in the meter reading and instantaneous values.
It requires an optical probe connector mircroUSB and FTDI chipset and mobile phone with ability to function OTG (On-The-Go) (see technical information for compatibilities web developer).
According to the Spanish regulation RD 1110/2007 of 24 August mandatory for accountants Type I and II, with more than 75kW contracted power. and all counters from 15kW with contracted 3.0 or 3.1 or higher rates.
Unlimited access closures and load curve provided it is stored in the meter reading and instantaneous values.
It requires an optical probe connector mircroUSB and FTDI chipset and mobile phone with ability to function OTG (On-The-Go) (see technical information for compatibilities web developer).
Show More