Calculator to work out quantity of concrete in piles by converting the pile diameter (mm) to radius, timesing by pi and then converting to meters cubed (m3).
This is a simple equation and the result is reliant on the correct input, the formula does not add or round up just uses pi as 3.14.
This is a simple equation and the result is reliant on the correct input, the formula does not add or round up just uses pi as 3.14.
Show More