Ampere Battery Charging Check

Ampere Battery Charging Check icon

Ampere Battery Charging Check

CrioSoft LLC

3.6

359 ratings

Free

With this app, you can measure charging speed, compare different chargers and cables, and monitor battery usage. Includes tools for testing charger performance, tracking activity time, and viewing detailed usage reports.

AppRecs review analysis

AppRecs rating 3.2. Trustworthiness 71 out of 100. Review manipulation risk 24 out of 100. Based on a review sample analyzed.

★★★☆☆

3.2

AppRecs Rating

Ratings breakdown

5 star

55%

4 star

9%

3 star

4%

2 star

4%

1 star

28%

What to know

Low review manipulation risk

24% review manipulation risk

Ad complaints

Many low ratings mention excessive ads

High negative review ratio

32% of sampled ratings are 1–2 stars

About Ampere Battery Charging Check

Introducing Ampere Battery Check, your ultimate companion for all things battery-related:


- Accurately measure the charging speed of your battery using different chargers, charging wires, or wireless sources.
- Conduct detailed comparisons between various chargers, wireless chargers, cables, and wires.
- Stay informed about the remaining usage time for common activities like web browsing and calls.
- Track the actual battery usage time for any app or activity and create a personalized reference table.
- For more information and detailed instructions, please visit the App's help page.
- Watch our comprehensive app functionality overview video at: https://www.youtube.com/@criosoft

Just got a new cable? Discover its quality and how well it charges your device with Ampere Battery Check!

Got a new charger? Test its true output using Amperes!
Want to determine the best wireless charger for your phone? Let this app be your guide!
Ampere Battery Charging Check Screenshots
Screenshot 1Screenshot 2Screenshot 3Screenshot 4Screenshot 5

Tap to Rate:

Reviews for Ampere Battery Charging Check

Add Nicknamez

Locks up

Has adverts that cannot be exited and don’t time-out, such that test results are never seen

K Nur

Test results are hoax

I am going to uninstall it, it shows too low watt

Similar to Ampere Battery Charging Check

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact