The Photo Simulator app lets you use augmented reality (AR) to create images of cell radios and/or integrated poles superimposed over real-world poles. This speeds up turnaround times and reduces the cost of developing photo mockups of new sites from landlords or city officials.
Use the Photo Simulator app to:
1. Superimpose 5G Radios on existing poles.
2. Superimpose integrated poles on the real world.
3. Take screenshots of the results.
Download the Photo Simulator, or Augmented Reality Cell Sites (ARCS), app now and start saving time and money.
Use the Photo Simulator app to:
1. Superimpose 5G Radios on existing poles.
2. Superimpose integrated poles on the real world.
3. Take screenshots of the results.
Download the Photo Simulator, or Augmented Reality Cell Sites (ARCS), app now and start saving time and money.
Show More