With this building management app, users can unlock doors, adjust room temperatures, and provide space feedback. Includes features for wayfinding, information updates, and digital ID display.

AppRecs review analysis

AppRecs rating 3.8. Trustworthiness 65 out of 100. Review manipulation risk 22 out of 100. Based on a review sample analyzed.

★★★☆☆

3.8

AppRecs Rating

Ratings breakdown

5 star

76%

4 star

6%

3 star

0%

2 star

6%

1 star

12%

What to know

Low review manipulation risk

22% review manipulation risk

High user satisfaction

82% of sampled ratings are 4+ stars (4.3★ average)

About Honeywell Vector Occupant

Honeywell Vector Occupant app can enhance your productivity and overall experience in your workspace.

Your phone is your key
- Unlock doors by shaking your phone or holding it next to a door reader

Want your space warmer or cooler?
- Let your facility admins know with one tap

Not happy with a space? Or want to let your facilities know that they are doing a good job?
- Rate the space with the app (This feature is available upon request)

Find your way and share your location inside your building
- Use our Wayfinding feature (This feature is available upon request)

Information at your fingertips
- Get relevant information and updates sent by your organisation or facility (This feature is available upon request)


Your ID?
- Whenever someone asks to see your photo ID, it’s in the app

Honeywell Vector Occupant app can only be used if your organization has signed up with Honeywell. If you would like to setup the occupant app in your organization, please contact DL-CORPAllegretto-Support@Honeywell.com.

*** App is meant to be used with iPhone ONLY ***

Disclaimer:
Continuous use of GPS running in the background may decrease battery life.
Honeywell Vector Occupant Screenshots
Screenshot 1Screenshot 2Screenshot 3Screenshot 4Screenshot 5Screenshot 6

Tap to Rate:

Reviews for Honeywell Vector Occupant

afqd

The only advantage it had is lost now

It had an edge over traditional badges as there was the capability to enter and exit the garage without opening the window and just tapping on a button... it works as a physical rfid badge now and the worst part is the success rate is 1 in 4 attempts involving a lot of waving and touching the reader

More from Honeywell International Sarl
Similar to Honeywell Vector Occupant
More from Honeywell International Sarl

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact