About Wi-Fi Camera
This is a APP for the four axis aircraft control via WiFi protocol
This APP function:
1.Remote control the four axis aircraft by iPhone/iPad/iPod.
2.Display the real-time video which taken by the camera on the aircraft,video data transmitted via 2.4G WiFi protocol.
3.Take the photo and video record on iPhone/iPad/iPod.
4.support 720P
This APP function:
1.Remote control the four axis aircraft by iPhone/iPad/iPod.
2.Display the real-time video which taken by the camera on the aircraft,video data transmitted via 2.4G WiFi protocol.
3.Take the photo and video record on iPhone/iPad/iPod.
4.support 720P
Wi-Fi Camera Screenshots
Tap to Rate: