AppRecs review analysis
AppRecs rating 4.1. Trustworthiness 70 out of 100. Review manipulation risk 26 out of 100. Based on a review sample analyzed.
★★★★☆
4.1
AppRecs Rating
Ratings breakdown
5 star
64%
4 star
7%
3 star
7%
2 star
21%
1 star
0%
What to know
✓
Low review manipulation risk
26% review manipulation risk
✓
Credible reviews
70% trustworthiness score from analyzed reviews
✓
High user satisfaction
71% of sampled ratings are 4+ stars (4.1★ average)
About Spool Ethanol Analyzer
The App also includes a mixing ratio calculator and it can be used even if you don't have access to the Spool Wireless Ethanol Sensor Kit.
The Spool Wireless Ethanol Sensor Kit can be purchased at www.spoolperformance.us
Spool Ethanol Analyzer Screenshots
Tap to Rate:
Reviews for Spool Ethanol Analyzer
nonjdgmkirdbkj
Calculator is no good.
The calculator is nowhere near precise enough as it should be. It should not round gallons needed to the nearest whole gallon. Fuel tank size should be adjustable by 0.5 gal instead of 1 gallon. Same thing with all the estimated ethanol grades. Should be by 1% and not 5%.
248love
The best
The analyzer and the app are flawless +1yr in. Was far more affordable than FueliT