Winching

Winching icon

Winching

Small Saucepan Pty Ltd

About Winching

The Winching app calculates the approximate winching effort required based on vehicle weight, surface type, incline angle, and number of damaged wheels. When winching indirectly e.g. using a pulley to redirect the tow cable, the app can also approximate the strain placed on the anchor point, and suggest sling configurations that will support the required load.
Winching Screenshots
Screenshot 1Screenshot 2Screenshot 3Screenshot 4Screenshot 5Screenshot 6Screenshot 7Screenshot 8Screenshot 9Screenshot 10
More from Small Saucepan Pty Ltd
Similar to Winching
More from Small Saucepan Pty Ltd

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact