Steel Guitar PRO

Steel Guitar PRO icon

Steel Guitar PRO

Yonac Inc.

4.6

63 ratings

$9.99

Use this guitar processor app to generate real-time audio with customizable models and effects. Includes built-in amps, FX processing, MIDI control, and extensive user customization options.

AppRecs review analysis

AppRecs rating 4.9. Trustworthiness 78 out of 100. Review manipulation risk 24 out of 100. Based on a review sample analyzed.

★★★★

4.9

AppRecs Rating

Ratings breakdown

5 star

76%

4 star

14%

3 star

5%

2 star

0%

1 star

5%

What to know

Low review manipulation risk

24% review manipulation risk

Credible reviews

78% trustworthiness score from analyzed reviews

High user satisfaction

76% of sampled ratings are 5 stars

About Steel Guitar PRO

Steel Guitar PRO is a highly advanced guitar processor that combines cutting-edge realtime audio generation with a truly expressive control interface. It provides many unique guitar models, built-in amps & FX processing, MIDI control, AUv3, and wide-ranging customizability.

:: Control Surface ::

Steel Guitar PRO features a powerful yet familiar control interface. Simply touch the strings to “pick,” and drag the slide bar to modulate pitch. By enabling enhanced slide control, you can even use multiple touches to tilt the slide bar, or dampen the strings. Fretboard dimension, string spacing, and pick guard size are all configurable. A high level of resolution enables minute pitch control and realistic vibrato. Settings let you vary guitar tone, sustain and release times, touch behavior, slide bar auxiliary control, handedness, and more.

:: Guitars ::

Steel Guitar PRO provides you with an arsenal of guitars to choose from: unique examples of humbuckers, single coils, P90s, and more. Instruments include many 6 string guitars, as well as 8- and 10-string steel guitar variants. Each family of instruments comes with many tuning to choose from, but you can also create and save your own. In addition, you have up to seven virtual “pedals” to bend individual or collections of string — much like a pedal steel. The pedals can be actuated by slightly tilting the device, or via MIDI, or even with the fretting touch. All of this is configurable by the user.

:: Built-In FX Processing ::

Steel Guitar PRO incorporates a virtual signal chain where you can put amps and FX in any combination. The included dozen amps and 20 FX are all custom tuned to evoke the best tones from the guitar processor. Each amp or effect features multiple parameters to precisely modify its tone and feel. These parameters are MIDI-mappable, so that you can control them via an external device. The amp collection covers a broad spectrum from bell-like cleans to thick overdrive. The FX include many analog inspired “pedals” that range from overdrives, distortions, mods, delays, reverbs, to beyond.

:: AUv3 & MIDI ::

Steel Guitar PRO can also be used as an AUv3 MIDI plugin. We developed a custom MIDI sub-protocol so that Steel Guitar PRO and its powerful control interface can run seamlessly inside an AUv3 host. You can also use a traditional MIDI keyboard or device to play Steel Guitar PRO, which readily accommodates MIDI pitch & mod wheels, and key velocity as well.

:: Useful Features ::

Steel Guitar PRO includes a comprehensive preset management system that allows you to save, modify, and share any number of your “rigs.” The standalone app also includes a handy “tape deck” where you can record, play, loop and import/export audio. MIDI learn feature is easy and intuitive to use, but also offers deeper customization. All audio processing is done in the highest resolution, natively and without resampling at rates up to 96kHz. The fluid user interface integrates readily with many different AUv3 hosts.
Steel Guitar PRO Screenshots
Screenshot 1Screenshot 2Screenshot 3Screenshot 4Screenshot 5Screenshot 6

Tap to Rate:

Reviews for Steel Guitar PRO

Bobeegallagh

Doesn’t work with g band

Tired of these companies selling music apps that are buggy or don’t work at all in the obvious DAW’s fo which anyone would use them. Cool sounds and all but can’t use it as a plugin nor does it show up with inter app audio. Apple Store refuses to give me a refund. Merchant refuses to give me a refund. They really don’t care. Buyer beware.

targetedscapegoat

Great App

As audio and guitar simulation apps go, this is gonna be about the best available imho.

Similar to Steel Guitar PRO

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact