Darts Match

Darts Match icon

Darts Match

Motionlab

AppRecs review analysis

AppRecs rating 3.9. Trustworthiness 71 out of 100. Review manipulation risk 24 out of 100. Based on a review sample analyzed.

★★★☆☆

3.9

AppRecs Rating

Ratings breakdown

5 star

51%

4 star

13%

3 star

19%

2 star

6%

1 star

11%

What to know

Low review manipulation risk

24% review manipulation risk

Credible reviews

71% trustworthiness score from analyzed reviews

Good user ratings

64% positive sampled reviews

About Darts Match

Play darts against a number of tough computer opponents and your Facebook friends in ‘Darts Match’, the most lifelike darts game on the market.

“This is a real bullseye of a game“ - The Sun Newspaper

Played on an officially approved PDC/Unicorn dartboard and in a pub-style atmosphere, ‘Darts Match’ offers a natural throwing action in a range of popular darts formats, perfect for both the avid darter and novice.

GAME FEATURES:

• Play Classic games of 501, 301, Around the Clock, and Cricket
• Take on Facebook friends, Computer Opponents or a random player
• Compete with your friends or the world to climb the leaderboards
• Determine the number of sets and legs played in local games
• Customise your darts in the store, over 50,000 combinations of flights, shafts and barrels.
• Perfect your throwing arm in practice mode
• Records three-dart averages, checkout percentages, total games won and many more stats.
• Suggested checkout finishes
• PDC/Unicorn approved dartboard
• Realistic caller and crowd sound effects

Don’t forget, it’s trebles for show, doubles for dough!

** Optimised for: iPhone 4S and above, iPod 5, iPad 2 and above.
Darts Match Screenshots
Screenshot 1Screenshot 2Screenshot 3Screenshot 4Screenshot 5

Tap to Rate:

Reviews for Darts Match

Kaniack

Ads again

Screen blurring, obscuring bullseye, boundaries blocked to seem under/over shot. Gmafb it’s a game that you’re programming with a computer. Hate to see you in a real game in a bar somewhere. Would be great to have a clear, crisp board instead of the current blurred sinkhole.

Bp220

Load problem

Game was great but now gets stuck on the load screen.

Similar to Darts Match

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact