WBS - Project Work Breakdown

WBS - Project Work Breakdown icon

WBS - Project Work Breakdown

皓 李

4.7

145 ratings

$8.99

In this app, you can create and organize work breakdown structures using a list and tree diagram, import work items from Excel, and export to PDF or Excel. Includes hierarchical project visualization, cost estimation, and export options.

AppRecs review analysis

AppRecs rating 4.7. Trustworthiness 74 out of 100. Review manipulation risk 22 out of 100. Based on a review sample analyzed.

★★★★

4.7

AppRecs Rating

Ratings breakdown

5 star

80%

4 star

13%

3 star

5%

2 star

1%

1 star

1%

What to know

Low review manipulation risk

22% review manipulation risk

Credible reviews

74% trustworthiness score from analyzed reviews

High user satisfaction

80% of sampled ratings are 5 stars

About WBS - Project Work Breakdown

Manage the work breakdown structure (WBS) in the list and tree diagram. Construct the work package tree and update the estimate; import work items from MS Excel and export the work breakdown structure to PDF, Excel, and image files. Also, we can convert a work breakdown structure to a project plan file in the QuickPlan app.

The WBS is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. It is a tree structure that shows a breakdown of the effort required to achieve a goal, such as a program, a project, and a contract.

Mobilinked WBS is THE easy-to-use WBS management app for the iPad. Using natural gestures on a clean interface makes WBS management more convenient, faster, and more efficient than ever before. Visualize and simplify the work breakdown structure in the outline and diagram view to break down work elements and determine labor, material, and total costs for each component. The app automatically adds costs up to the element hierarchy, and supports continuous and mass tracking.

The WBS can be exported to image, Excel, and PDF files AND converted to QuickPlan (https://itunes.apple.com/app/id621375878) as a project plan.

The WBS supports mass entry of work items and import of work items from an MS Excel file.

- Feature video - https://youtu.be/FZ7puht7Nao
- Support - at http://wbs.mbl.app

WBS provides a fast, intuitive and discoverable experience for users in a clean and elegant interface
- Work package maintenance - natural gestures, continuous and batch input in outline and diagram views.
- Project costing - support labor and material costs for work packages Communication - export the work breakdown structure as an image/PDF and Excel file.
- Collaboration - Share the work breakdown structure across multiple devices via email, airdrop, and third-party cloud apps.
- Project plan integration - Export to a project plan for QuickPlan.

FEATURES
- Manage work items in a text outline view and a graphical tree diagram view.
- Continuous and batch entry of work items.
- Import from MS Excel file
- Three chart layouts, AND Display as color or grayscale style.
- Color and icon
- Supports large projects (smooth interaction for 1000 task packages)
- Natural gestures (swipe left/right to adjust outline levels, tap with two fingers to collapse/expand all groups, hold and move to change order).
- Create project quotes with labor and material costs; labor costs can be entered as expenses.
- Adjust project fee rate, currency, and work package category.
- Collapse/expand specific or all groups; zoom in on a chart view.
- User interface customization options
- Share the work breakdown structure with other devices via email, airdrop, and third-party cloud apps.
- Export the outline with costs to a new project plan to QuickPlan (https://itunes.apple.com/app/id621375878).
- Export the entire work breakdown structure or a selected workgroup to an Excel file.
- Export the entire work breakdown structure or a selected workgroup to a PDF file with export customization options.
- Export the entire work breakdown structure or a selected workgroup to an image file.
- Undo and toast with voice output
- Duplicate work breakdown structure

Work breakdown structure makes work planning easy and fast, and helps estimate future project schedule by easily viewing work items and costs. The best project management app for your business on iPad.

Tap to Rate:

Reviews for WBS - Project Work Breakdown

sfghuyfvhjj

No good way to print

You should be able to select print like any other app, but that’s not available. The best you can do is export to an Excel file and then import it to a numbers file and then print it. ALSO no way to enter actual hours to determine actual cost

Gelson Salvador

Um excelente programa

É um recurso muito bom, apenas deveria ter também em português.

Similar to WBS - Project Work Breakdown

©2023 Verdant Labs LLC. All rights reserved.

Privacy PolicyContact